Not a member yet? Why not Sign up today
Create an account  

Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
EXPERIMENT_GL-07_MODIFICATION_LOG

#1
Quote:========================================================
= OUTPOST A-28 ASSET MODIFICATION LOG                  =
= FILTER(S): A-28 R&D WING :: EXPERIMENT SET GL-07     =
========================================================

– ENTRY 01 :: 2137 / 8 / 1 –
EXPERIMENTAL MODIFICATION [[GL-07 GILL UNIT]] APPROVED FOR ASSET TRIAL

R&D BOARD NOTES:
Unit iteration seven adequately addresses cost and utility concerns raised by previous generations, which had in turn become relevant due to the critical failure of iteration two’s prototype trial.

Iteration seven is approved for a limited production trial within Atlantic Outpost #28. Doctor Adimon (active unit HQ-S-17) will oversee selection and installation of ten viable assets chosen from the outpost’s existing population, as well as initialization of reporting protocols.

- RD-02
Reply

#2
Quote:– ENTRY 02 :: 2137 / 8 / 6 –
ASSET SELECTION SUBMITTED BY HQ-S-17

PROPOSED ASSET LIST (10):
:: A28-06-1-16
:: A28-06-1-24
:: A28-06-2-03
:: A28-06-2-09
:: A28-06-2-12
:: A28-06-2-17
:: A28-06-3-02
:: A28-06-3-03
:: A28-06-4-01
:: A28-06-4-05

SUBMISSION NOTES:
Assets chosen are all selected from the latest generation, of ages ranging from thirteen to seventeen years. This should be of adequate development to not face complications beyond the apparatus’s adaptive means due to further physical development, while also proving young enough to adapt to the implant’s bodily requirements and effects.

Of special note regarding assets 3-02 and 3-03, their status as twins could prove of particular interest with regards to further research regarding the apparatus’s results and consequence in as close to a controlled construction as one can achieve with living subjects.

- S-17

========================================================
=   SUBMISSION APPROVED FOR IMMEDIATE IMPLEMENTATION   =
========================================================
Reply

#3
Quote:– ENTRY 03 :: 2137 / 8 / 8 –
ASSET MODIFICATION COMPLETE
ASSET FAILURE RECORDS UPDATED

SUBMISSION NOTES:
All implant surgeries have been completed, with 80% success. Assets 1-16 and 2-03 suffered immediate complications, with the former succumbing to physical rejection well before its anesthesia expired. Asset 1-24 is under medical surveillance in an effort to enforce survival.

- S-17

========================================================
= ASSET EXPIRATION EVALUATION - A28-06-1-16            =
= CAUSE OF DEATH: Augmentative Rejection               =
=                                                      =
= SURVIVED BY: Mother (A28-05-8-04)                    =
= INHERITED EXPENSE:                                   =
= - OPERATION COST : 57.000                            =
= - IMPLANT COST : 35.500                              =
= :: ADMIN NOTE: SALVAGEABLE; cost of recovery         =
= - DISPOSAL COST: 2.500                               =
=                                                      =
= TOTAL SERVICE EXPENSE: 95.000                        =
= – Billed to surviving family.                        =
========================================================

========================================================
= ASSET EXPIRATION EVALUATION - A28-06-2-03            =
= CAUSE OF DEATH: Self-Vandalism                       =
=                                                      =
= SURVIVED BY: Father (A28-04-4-12),                   =
= :: Brother (A28-05-20-09)                            =
= INHERITED EXPENSE:                                   =
= - OPERATION COST : 57.000                            =
= - IMPLANT COST : 15,000.000                          =
= :: ADMIN NOTE: DAMAGED BEYOND RECOVERY;              =
= :: Asset severely damaged implant via extensive      =
= :: lacerations at its own neck upon waking from      =
= :: anesthesia.                                       =
= - VANDALISM FINE : 100.000                           =
= - DISPOSAL COST: 2.500                               =
=                                                      =
= TOTAL SERVICE EXPENSE: 15159.500                     =
= – Billed to surviving family.                        =
========================================================

SURVIVING ASSETS: A28-06-1-24, A28-06-2-09, A28-06-2-12, A28-06-2-17, A28-06-3-02, A28-06-3-03, A28-06-4-01, A28-06-4-05
Reply



Forum Jump:


Users browsing this thread:
1 Guest(s)